Section 6. Risk factors, etc. to be included in the tender documents Previous Next The client must incorporate the following in the tender documents:a.the risk factors revealed during planning and design that have not been eliminated, see Section 5(2) b)b.plans with measures as a consequence of mapping and risk assessment under Section 5(2) c).
The client must incorporate the following in the tender documents:a.the risk factors revealed during planning and design that have not been eliminated, see Section 5(2) b)b.plans with measures as a consequence of mapping and risk assessment under Section 5(2) c).
a.the risk factors revealed during planning and design that have not been eliminated, see Section 5(2) b)
the risk factors revealed during planning and design that have not been eliminated, see Section 5(2) b)