Section 6. Risk factors, etc. to be included in the tender documents

The client must incorporate the following in the tender documents:
  1. a.
    the risk factors revealed during planning and design that have not been eliminated, see Section 5(2) b)
  2. b.
    plans with measures as a consequence of mapping and risk assessment under Section 5(2) c).