Chapter 28. Work in connection with carbon dioxide extinguishing systems
Section 28-1. Requirement for instructions on installation and testing of carbon dioxide systems
Section 28-2. Alternative measures when carbon dioxide systems are inoperable
Section 28-3. Putting carbon dioxide systems back into operation following repairs or inspection
Section 28-4. Evacuation routes
Section 28-5. Precautions in connection with the installation of carbon dioxide systems
Section 28-6. Precautions when testing carbon dioxide systems
Section 28-7. Locking up carbon dioxide systems
Section 28-8. Precautions in connection with repairs and inspections of carbon dioxide systems
Section 28-9. Repairs, maintenance and inspection of carbon dioxide systems