Regulations concerning the Performance of Work

  1. Part 1: Introductory provisions

    Chapter 1. Introductory provisions

  2. Part 2: Requirements for work involving chemical and biological risk factors

    Chapter 2. Substance index

    Chapter 3. Work where chemicals may be a risk to the health and safety of employees

    Chapter 4. Work with asbestos

    Chapter 5. Hot work

    Chapter 6. Work in surroundings that may entail exposure to biological agents

    Chapter 7. Work where there is a risk of reproductive harm

    Chapter 8. Work at wastewater treatment plants

    Chapter 9. Work with cytostatics

  3. Part 3: Requirements for work under exposure to physical risk factors

    Chapter 10. Requirements for the use of work equipment

    Chapter 11. Facilitating the use of work equipment

    Chapter 13. Work equipment subject to a requirement for inspection by a competent enterprise

    Chapter 14. Work that can entail exposure to noise or mechanical vibrations

    Chapter 15. Ionising radiation

    Chapter 16. Artificial optical radiation

    Chapter 16 A. Electromagnetic field

    Chapter 17. Work at height

    When scaffolding extends onto a roof or the top of another structure, account shall be taken of its intended use, to ensure that those who use it as a work platform or for access, are not at risk of injuries from falls or falling objects.
    If the top scaffold deck is used for work at cornices and access to the roof, the access to the roof shall be safe. Work at cornices shall take place in a manner that does not expose workers to adverse physical strain.

    Chapter 18. Work with lifting equipment

    Chapter 19. Work with mobile work equipment

    Chapter 20. High-pressure jetting

    Chapter 21. Excavation work

    The employer shall ensure that excavation pits deeper than 2 m are shored or have a safe angle of slope. Documentation of the calculations for shoring shall be available on request.
    Shoring shall protrude at least 0.10 m above the edge of the excavation.
    When using prefabricated shoring or other means of physical protection in the excavation pit, the instructions for use shall clearly show for what depths and soils the structure is designed. If such instructions for use exist, the requirement that documentation of calculations must be available in the workplace will no longer apply. Sheet piles are not considered to be prefabricated shoring.

    Chapter 22. Safety signage, signalling and communication

  4. Part 4: Requirements relating to other work that involves risk

    Chapter 23. Risk assessments, training and information in connection with manual work

    Chapter 23A Work that may entail a risk of exposure to violence and threats of violence.

    Chapter 24. Work on operations control and safety monitoring

    Chapter 25. Requirements for inspection, marking and filling of compressed air cylinders for diving and respiratory protection equipment

    Chapter 26. Health and safety during work under water or under increased ambient pressure

    Chapter 27. Rock work

    Chapter 28. Work in connection with carbon dioxide extinguishing systems

    Chapter 29. Work in or on tanks, pipelines, rooms etc. where flammable products or hazardous substances could be present

    Chapter 30. Risk of avalanches in occupancy areas and work areas

  5. Part 5: Register of exposed employees

    Chapter 31. Register of exposed employees

  6. Part 6: Final provisions

    Chapter 32. Final provisions